A clearwater inspection checks that clean water, such as roof runoff or sump water, is not going into the sanitary sewer. The sewer authority checks sales so that clean water stays out of the sanitary sewer. The authority was formerly the Rock River Water Reclamation District. If you are listing a home, this is a step to plan early, not on the week of closing. See who owns the sewer line for the rest of the sewer picture.
The FRSA clearwater inspection rule
FRSA says the owner must hire a plumber licensed by the State of Illinois to inspect the property and complete the Clearwater Inspection Form before a sale. The FRSA code goes further. It says no person may sell, transfer or convey ownership of a building served by FRSA sewer until a current certification of compliance is obtained and deposited with FRSA (FRSA FAQs, FRSA Code of Ordinances). In practice, the form is part of the closing paperwork.
What the plumber checks
The form asks the plumber to mark whether any of these discharge to the sanitary sewer (FRSA Clearwater Inspection Form):
- Roof drains and downspouts connected to the house drain.
- Foundation drains.
- A storm or ground water sump pump discharging to the sanitary sewer.
- A combination pump.
- A diverter valve.
- An unsealed sanitary sump pit.
- A flexible discharge hose on a sump pump discharge.
The rule behind the form is plain. FRSA code bans any discharge or unapproved connection of storm water, foundation drain water, ground water or roof runoff to the authority sewer. Sump pump water belongs outside, not in the sewer. We state the rule here and leave sump work to others.
If the inspection fails: 30 and 60 day deadlines
A failed form is not the end of the sale, but it starts a clock. FRSA code gives a 30 days compliance period for an illegal roof or foundation drain, sump pump or diverter valve. Clear water entering through an under-the-basement-floor connection gets 60 days (FRSA Code of Ordinances).
| Finding | Time to fix |
|---|---|
| Illegal roof drain or foundation drain connection | 30 days |
| Illegal sump pump or diverter valve | 30 days |
| Clear water through an under-the-basement-floor connection | 60 days |
Work to correct a connection on the sewer side must be done by a licensed plumber and may need FRSA permits. Ask your plumber to write down what failed, what will fix it and who files the permit. Our permit guide covers the permit side.
Sump pits and the plumbing code
The Illinois Plumbing Code keeps the two kinds of pit apart. Sumps and ejectors that handle sub-soil drainage and footing drains may not receive any sewage, and a sewage sump may not receive sub-soil drainage or footing drains (77 Ill. Adm. Code 890.1360, 77 Ill. Adm. Code 890.1360). That is one reason the form asks about an unsealed sanitary sump pit. We mention it so you know what the plumber is looking at.
What a seller should do first
- Book the clearwater inspection before you list, not after you have an offer. The form is valid for one year, so an early date still covers a normal listing.
- Walk the outside. Look at where the downspouts end and where the sump pump discharge goes. A hose or pipe that runs into the house drain is what the form is looking for.
- Ask the plumber to check for a diverter valve or an unsealed sanitary sump pit in the basement.
- If something fails, fix it inside the 30 or 60 day window and get the form updated.
- Give a copy of the completed form to your agent and the title company. Keep your own.
The plumber sets the price of the inspection, so ask for it when you book. If the same plumber is going to find the problem and fix it, ask whether the inspection fee is credited. A drain camera at the same visit is optional, and the national range is $125 to $500.
Rockton and other towns have their own rules
The rule follows the sewer, not the zip code. In Rockton, Village Code Sec. 51.062 requires a current certification of compliance, completed by an Illinois-licensed plumber, before a building on village sewer is sold or transferred, and the village has its own Clearwater Inspection Form, revised December 2025 (Rockton Code Sec. 51.062, Rockton form). The same 30 day and 60 day fix periods apply to illegal roof drain, sump pump and under-floor connections.
Durand runs a Clear Water Inspection program through its sanitary district. Towns on their own sewer systems, such as Belvidere and Byron, are outside FRSA, so call the village or city office. If you live in an FRSA town like Loves Park or Machesney Park, the FRSA form applies.
What happens if you skip it
FRSA code ties the sale to the certification, which means a closing can stall when the form is missing or out of date. After the sale, an illegal connection is still illegal. A failed form is something a buyer can negotiate over, so fix the problem first.
Every plumbing price on this site, with its source, is on the plumber cost page.
Sources (8)
- Four Rivers Sanitation Authority, FAQs
- Four Rivers Sanitation Authority, Code of Ordinances
- Four Rivers Sanitation Authority, Clearwater Inspection Form
- Four Rivers Sanitation Authority, who we are
- Illinois Plumbing Code, 77 Ill. Adm. Code 890.1360 (sumps and ejectors)
- Village of Rockton, Code of Ordinances, Sec. 51.062
- Village of Rockton, Clearwater Inspection Form
- HomeGuide, sewer camera inspection cost
Want a price for your own house?
Call, text, or send the form. You get a price back before any work is scheduled.
Quick answers
Do I need a clearwater inspection to sell my house in Rockford?
If the house is on FRSA sewer, the form is required. Before a sale the owner must hire a State of Illinois licensed plumber to complete the Clearwater Inspection Form, and FRSA code bars the sale until a current certification is on file.
How long does a clearwater inspection take?
FRSA says the plumber's visit takes 15 to 20 minutes. The form stays valid for one year.
Who can do a clearwater inspection?
A plumber licensed by the State of Illinois. FRSA's FAQ says the owner must hire one to inspect the property and complete the form.
What happens if my house fails the clearwater inspection?
FRSA gives 30 days to fix an illegal roof or foundation drain, sump pump or diverter valve, and 60 days for clear water through an under-the-basement-floor connection.
Can sump pump water go into the sanitary sewer?
FRSA code bans discharge of storm water, foundation drain water, ground water and roof runoff to its sewer. A sump pump that discharges to the sanitary sewer is one of the items the clearwater form marks.
Does the clearwater rule apply in Rockton?
Rockton has its own rule. Village Code Sec. 51.062 requires a certification of compliance completed by an Illinois-licensed plumber before a building on village sewer is sold, with a village form revised December 2025.
How much does a clearwater inspection cost?
FRSA does not set what plumbers charge for it. Ask the plumber for the price when you book, and ask whether it is credited if they also make the fix.
What if I am a buyer and the seller has no form?
Ask your agent or title company for it before closing. FRSA code ties the conveyance to a current certification of compliance, so a missing form is something to settle in writing before you sign.